
Work Breakdown Structure (3 of 3)
Once the WBS is in place, it is time to set up the project based on the individual pieces. Assign a leader, set of deliverables, and budget for each WBS segment to assist with reporting and tracking on progress.
Once the WBS is in place, it is time to set up the project based on the individual pieces. Assign a leader, set of deliverables, and budget for each WBS segment to assist with reporting and tracking on progress.